Browsing Category

Pool excavation

Pool excavation

All About Pool Excavation In Sydney

Thinking about swimming pool excavation? Well, you should have a lot of doubts in mind. Most of the customers using the pool will not have detailed knowledge about it like the professionals. Sometimes there will be a miscommunication about the service, installation product and the product. In this article let us discuss the construction process of the pool and the important questions related to it. 

The backyard is similar to the chocolate box. Construction a pool without a soil test is very difficult. Without doing soil test the pool contractors cannot identify the things that are inside the soil. Soil conditions should support the construction of the pool and it will also cost extra money for the installation of the pool. The components for the structure must be determined by the contractor. Most house owners will have limitations in their budget and the cost of constructing the pool will increase if the place selected for constructing the pool has water and rock. 

Alternative options that can be done when you hit the rock during the construction process of the pool:

If you find a rock in the selected place then it is better to change the place for constructing the pool. It is just another try. Dig a test hole before starting the construction project. The second option is to elevate the height of the pool in the same selected location. If you do not have any alternative place then this is the best solution. It will cost extra for pool excavation since you must change the height of the wall and you must fix extra fill dirt.

The third option is to blast or hammer the rock and construct the pool in the same place. In Sydney, you need to pay separately for blasting and labour. Some companies will charge extra money for the equipment also. Some pool contractors in Sydney will blast or hammer the rock on their own and include it in the total cost of constructing the pool. If you have restrictions in the budget then close the hole and construct the pool in the next house. 

Alternative options that can be done when you hit the groundwater:

The dewatering system must be installed. The hole for constructing the pool must be kept dry until you construct the pool in that place. This option is best suited for the fibreglass type. If the groundwater level is high then the gravel must be filled around the pool surface. If the contractors fill extra gravel on the pool surface then they will cost you extra money. The average cost for filling gravel around the pool surface is approximately 400 dollars for one load of gravel. The second option is to elevate the pool surface. 

Excavating the pool will generate specks of dirt. Customers can haul the dirt. Before constructing remove all the furniture and other things in your backyard and once you complete the installation process replace them at their own place. Contractors will do all this extra work and it will be included in the cost of constructing the pool.